The anchor bolt plate is one of the parts of the pipe joint anchor. The material adopts welding ring and rolling head to make rod body, cutting around the ring to make retaining ring, and cutting board, punching and punching to make pallet. There are many types of anchor bolt plates, the main ones commonly used in mines are butterfly plates and flat plates. The bearing effect of butterfly plates is better than that of flat plates.
As an important part of the bolt support system, the performance of the bolt plate directly affects the supporting effect of the bolt. The function of plate is to transfer the thrust generated by the tightening torque of the nut to the top lining to generate initial anchoring force. At the same time, it transmits the pressure of the top lining of the roadway to the bolt, which generates working resistance, strengthens the surrounding rock together, and prevents the top lining of the roadway displacement. Mining Domed Plate,Split Set Bolt Domed Plate,Rock Bolt Domed Plate,Mining Rock Bolt Plate ANTO MINING EQUIPMENT CO.,LTD , https://www.antobolts.com
Sunshore Universal Terminal Project: The hydraulic main body completed 34 boxes of prisms, 28 boxes of back filter layers, backfill, 21 cast-in-place caisson roofs, and 3 sections of bottom wall. Auxiliary construction projects are in preparation for tendering.
Large-scale deep-water ore wharf project: The temporary road surface clearing is basically completed, and 50% of the gravel cushion is completed, laying the foundation for the formal construction of the wharf.
Pipeline installation engineering: Pipeline pipelines and docks, vehicle loading and unloading areas, and finished oil tanker pipelines have all been completed; fuel pipelines have been installed 9000 meters, accounting for 65% of the total.
In addition, the first breakwater project, 200,000-ton channel project, Shugang Avenue and street lighting project, production dispatch building project, accident emergency pool, fire water station, and sewage treatment plant have all been completed.
Yantai Port West Port Port Project completed 2.1 billion investment
Yantai Port West Port Port Project has completed an investment of approximately 2.1 billion yuan since its construction began. The end of May this year, the project entity invested 13.21 million yuan. among them: