[Procedures] Article 620 of the power distribution lines within the stope (substation, below) shall be subject to the following provisions: (1) Plan to stop sending electricity and strictly enforce the work ticket and operating ticket system. (2) If the non-planned power transmission is stopped, it shall be executed after the dispatcher agrees, and both parties shall make a stop transmission and transmission record. (3) In the event of an accidental power outage, the implementation of the first power outage, and then the implementation of the power outage procedures, take safety measures to make a record. (4) It is strictly forbidden to stop sending electricity when the time is up. [Execution Description] Planned power-off refers to the power-off of power supply equipment, facility maintenance, and position adjustment. The work ticket and operation ticket system shall be implemented in accordance with the "Electric Safety Work Regulations for Power Plants and Substations Electrical Part" (GB 26860-2011). Unplanned power transmission refers to the power transmission and shutdown of power supply equipment and lines due to temporary maintenance, position adjustment, addition and subtraction of cables, and power supply switching. Accident blackout refers to the power outage of power supply equipment, facilities and lines in the event of an accident. The power transmission at the time of the appointment means that the power transmission time is agreed in advance, and the power transmission without any contact procedure is stopped when the power is stopped. H-beam Gantry Type Welding Machine H-beam Gantry Type Welding Machine H-Beam Gantry Type Welding Machine,Gantry Type Welding Machine,Gantry Welding Machine,H-Beam Gantry Welding Machine Wuxi Zhouxiang Complete Set of Welding Equipment Co., Ltd. , https://www.beamweldingmachine.com
Operation requirements for power transmission lines in open pits
Operation requirements for power transmission lines in open pits