Plastic Bear Cup Injection Mold

<

Model NO.: RTPM2013027
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: CE, ISO
Standard: DME
Customized: Customized
Core Steel: P20
Cavity: 1X2
Lead Time: 20-30 Days
Mould Base: Yudo
Trademark: Root
Transport Package: Wooden Box
Specification: CE/SGS/RoSH
Origin: Qingdao Shandong
HS Code: 8480710090
Description:

Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.

Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Specification:
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(negotiable)
Delivery Time: 30-45 days
Specification
Design Software: UG/CAD
Analysis Software: Moldflow
Preferred Formats: STP/IGES/UG
Design Time: 7-15 days
Manufacture Time: 20-30 days
Delivery Time: 30-45 days

Sorter

SKS International Trading Company Limited , http://www.ahcolorsorter.com