1) There are sufficient industrial sites to accommodate the relevant buildings (structures); 2) The distance between the selected plants is short and the ore is convenient to transport, or there are better external transportation conditions; 3) There is a waste rock site; 4) There are flood control conditions (generally 2m above the maximum flood peak) and are not affected by the collapse of mountain rocks; 5) There are good geological conditions, and try to avoid the main development of roadways through faults, aquifers and other unfavorable strata; 6) Minimize the amount of pioneering work. In short, when selecting a reasonable position, it is impossible to analyze all the above-mentioned influencing factors, and the designer must grasp several main contradictions for analysis, and then obtain a reasonable position. In Figure 7-23, the method of exploiting the deposit has been developed for the development of the lower shaft. According to the principle of minimum moving power in the underground, the position 1 is reasonable. There are good waste rock sites at 1 and 3, and there are ideal industrial sites. However, if the shaft is set to position 1, it must form two-wing ventilation. Ventilation wells need to be dug in both wings, so the amount of infrastructure construction is large, the construction period is long, and it is conducive to management. This will be the main contradiction in determining the position of the shaft. Finalization of the main shaft dug, dug in position 3 main air shaft, forming a corner ventilation, greatly reducing the amount of infrastructure projects and funding, shorten the cycle of infrastructure. After considering this condition, the location of the main roadway is determined. In order to understand the condition of the rock formation that the wellbore will pass through, check whether it is beneficial to the wellbore and maintenance factors. Generally, it needs to play more than 10~15m and be deeper than the wellbore 3~5m. When the main roadway is an inclined shaft, it is necessary to drill holes that are not more than 50m apart and perpendicular to the wellbore. In mines with more complex lithology, the necessity of playing is obvious. For example, if an asbestos mine has not been drilled in advance, a thicker fracture zone is encountered during the excavation of the shaft. As a result, special methods have to be adopted. This not only delays the construction period, increases the cost of excavation, but also breaks through the budgetary estimate of infrastructure investment. .
Titanium Dioxide Food grade, is the abbreviation of food grade titanium dioxide. It is a highly fractionated, non coated anatase titanium dioxide, also known as food grade titanium dioxide, or pharmaceutical grade titanium dioxide.Sometimes it is also made into liquid form to facilitate dispersion, and is widely used in pharmaceutical, food, and cosmetics industries.
Medicine: in pharmaceutical preparations, it can be used as a
white colorant to prepare film coating suspension, sugar coating and
gelatin capsule, and can also be mixed with other colorants for use in
skin preparations, and can also be used as a drug forming agent instead
of starch.
Food:
used in candy coating, cold fruits, jelly, chewing gum, non sweet solid
drinks and concentrated solid drinks, milk containing drinks, puffed
food. Candied fruit (colloquial), jam, salad dressing, mayonnaise and other foods that need whitening
Cosmetics: foundation make-up, powder, sunscreen, eye shadow,
lipstick, lipstick, toothpaste, talcum powder, prickly heat powder,
cream, white soap.
white pigment for food, Titanium Dioxide for food industry, TiO2 food grade Henan Chuange Industry CO.,LTD , https://www.cgpvcresin.com
Mainly develop roadway position determination method
The main options for developing the location of the roadway are mentioned in the second section of this chapter. In addition, only the requirements for selecting the location of the main roadway are mentioned: