12V Starter Motor for Jcb, Perkins Marine, 2-2553-Bo, Lester 18949, 0001109035

<

Model NO.: 344
Components: Available
Packing: Strong Neutral Packing
Lead Time: 15-35 Days
Trademark: zach
Transport Package: Strong Wood/Box Packing
Specification: 1: 1 Original Specification
Origin: Anhui
HS Code: 8511409900
Model NO.: 344
Components: Available
Packing: Strong Neutral Packing
Lead Time: 15-35 Days
Trademark: zach
Transport Package: Strong Wood/Box Packing
Specification: 1: 1 Original Specification
Origin: Anhui
HS Code: 8511409900

We Promise:

 
  • 100% NEW and Made with the Highest Quality Components Available
  • Full One Year Warranty
  • Computer tested for consistent Quality and unsurpassed reliability
  • Meets or Exceeds Original Specifications



Product description

1.Specification: 

Starter - Bosch style 12 volt, 9 tooth, 2.0kw
Permanent Magnet Gear Reduction, CW rotation

0001109035, 0-001-109-035, 714/35600, 714/35600R, 1850866, 18508660, 185086600, 19960488, 19960489, 50027532, 18949, 120-151

Perkins engines 103-13, 1294cc 3-cyl 20.8kw
Perkins engines 103-15, 1496cc 3-cyl 23.5kw
Perkins engines 104-19, 1995cc 4-cyl 31.7kw
Perkins engines 104-22, 2216cc 4-cyl 37.3kw
Perkins engines 404C-22 IOPU, 2216cc 4-cyl 37kw
Perkins engines 404C-22, 2216cc 4-cyl 38kw
Perkins engines 404C-22G, 2216cc 4-cyl 33.4kw
Perkins engines 404C-22T, 2216cc 4-cyl 45.5kw

 

2.Transaction Term:

Payment  T/T, L/C,Paypal,Western Union
Delivery Time 25Days
Stock 5pcs 
Warranty one year
Certificate ISO/TS16949

 


Welcome:

12V Starter Motor for Jcb, Perkins Marine, 2-2553-Bo, Lester 18949, 0001109035


FAQ:

Q1. What is your terms of packing?
A: Generally, we pack our goods in ZACH  boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters and the order quantity reach our requirment.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.


 


 

We Promise:

 
  • 100% NEW and Made with the Highest Quality Components Available
  • Full One Year Warranty
  • Computer tested for consistent Quality and unsurpassed reliability
  • Meets or Exceeds Original Specifications



Product description

1.Specification: 

Starter - Bosch style 12 volt, 9 tooth, 2.0kw
Permanent Magnet Gear Reduction, CW rotation

0001109035, 0-001-109-035, 714/35600, 714/35600R, 1850866, 18508660, 185086600, 19960488, 19960489, 50027532, 18949, 120-151

Perkins engines 103-13, 1294cc 3-cyl 20.8kw
Perkins engines 103-15, 1496cc 3-cyl 23.5kw
Perkins engines 104-19, 1995cc 4-cyl 31.7kw
Perkins engines 104-22, 2216cc 4-cyl 37.3kw
Perkins engines 404C-22 IOPU, 2216cc 4-cyl 37kw
Perkins engines 404C-22, 2216cc 4-cyl 38kw
Perkins engines 404C-22G, 2216cc 4-cyl 33.4kw
Perkins engines 404C-22T, 2216cc 4-cyl 45.5kw

 

2.Transaction Term:

Payment  T/T, L/C,Paypal,Western Union
Delivery Time 25Days
Stock 5pcs 
Warranty one year
Certificate ISO/TS16949

 


Welcome:

12V Starter Motor for Jcb, Perkins Marine, 2-2553-Bo, Lester 18949, 0001109035


FAQ:

Q1. What is your terms of packing?
A: Generally, we pack our goods in ZACH  boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters and the order quantity reach our requirment.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.


 


 

Machinery Parts is namely machine parts, it is basic components of machine. 

Since the present of machine, the corresponding mechanical parts appear. But as also be a discipline, machinery parts separated from the mechanical structure and mechanics. With the development of mechanical industry, new design theory and method, new materials, new technology all appear one after another, then machinery parts entered a new stage of development. Theories such as finite element method and fracture mechanics, elastic hydrodynamic pressure lubrication, optimization design, reliability design, computer aided design (CAD), entity modeling (Pro, Ug, Solidworks, etc.), system analysis and design methodology has been gradually used in the research and design of machinery parts. Better combination of a variety of disciplines, combination of macro and micro to search new principle and structure, more dynamic and precise design, more efficient use of the electronic computer, the further development of design theory and method, is the important trend in the development of the discipline.

Machinery Parts

Machinery Parts,Aluminum Die Casting Machinery Parts,High Precision Machinery Parts,Machine Part

NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY , https://www.blcastings.com